Skip to content
ONE-STOP EXCAVATOR & DIESEL ENGINE PARTS SOLUTION EXPERT | GUANGZHOU, CHINA
Request Quote
Quick sourcing

Diesel Engine Parts

J08E Rocker Arm Assembly 13800-E0040 for Hino Engine Repair Parts

MOQ: 1pcs Price: Negotiable
Part No.
13800-E0040
Engine Model
Hino J08E
Material
High-Strength Alloy / Cast Steel (OEM Size)
Warranty
6 Months
Place of Origin
Guangdong, China
Chat on WhatsApp

Send OEM number, quantity, destination, or photos. We will reply with quotation, lead time, and fitment notes.

Fitment check OEM number, engine model, and machine model confirmation.
Manual quote Price, MOQ, stock, lead time, and replacement options.
Export support Packing notes, mixed order support, and shipping details.

Product Details

J08e Rocker Arm Assembly 13800-e0040 Suitable For Hino Engine Repair Parts

Product Overview

This high-quality Rocker Arm Assembly, part number 13800-E0040, is specifically designed for the Hino J08E diesel engine. As a critical component in the valve train mechanism, this assembly ensures precise valve timing and optimal engine performance for heavy-duty applications.

Crafted to meet strict OEM specifications, this J08E rocker arm assembly is an ideal replacement part for Hino engines commonly found in construction equipment, industrial machinery, agricultural vehicles, generator sets, marine applications, and material handling equipment. The assembly is manufactured under strict quality controls to ensure reliable operation and extended service life.

Key Features & Benefits

  • OEM Specification Fitment: Manufactured to match the original Hino J08E rocker arm assembly dimensions and tolerances, ensuring direct bolt-on replacement without modifications.
  • Precision Engineering: Each rocker arm is cast and machined to exacting standards for consistent valve lift and timing, critical for maintaining engine power and fuel efficiency.
  • Durable Construction: Built from high-strength materials to withstand the extreme heat and mechanical stress of diesel combustion cycles, reducing the risk of premature wear or failure.
  • Enhanced Valve Train Stability: The assembly provides stable and precise actuation of intake and exhaust valves, minimizing noise and vibration while improving overall engine smoothness.
  • Complete Assembly: Supplied as a fully assembled unit, including all necessary mounting hardware for a straightforward installation process.
  • Rigorous Quality Testing: Each unit undergoes a comprehensive machinery test report and video outgoing inspection to verify performance and dimensional accuracy before shipment.

Technical Specifications

Specification Details
Part Number 13800-E0040
Product Type Rocker Arm Assembly
Engine Model Hino J08E
Engine Type Diesel
Material High-Strength Alloy / Cast Steel (OEM Size)
Weight 5.0 kg
Warranty 6 Months
Defects Liability Period 6 Months
Place of Origin Guangdong, China
Packing Plastic Bag, Box, Carton
OEM Service Available
Video Inspection Provided
Machinery Test Report Provided

OEM Cross-Reference

This rocker arm assembly carries the primary part number 13800-E0040 (also written as 13800E0040). It is an OEM-grade replacement designed specifically for the Hino J08E engine series. Please verify your existing part number against this reference to ensure correct fitment. For additional cross-reference support or to confirm compatibility with your specific engine variant, please contact our technical sales team.

Compatibility

This 13800-E0040 Rocker Arm Assembly is commonly used for the following applications equipped with the Hino J08E diesel engine:

  • Construction Equipment: Excavators, wheel loaders, and bulldozers.
  • Industrial Machinery: Compressors, pumps, and industrial power units.
  • Agricultural Vehicles: Tractors and harvesters.
  • Generator Sets: Stationary and mobile power generation units.
  • Marine Applications: Workboats, fishing vessels, and auxiliary engines.
  • Material Handling: Forklifts and telehandlers.

Global Supply & Distribution

We maintain a robust global supply chain to serve international B2B buyers efficiently. Our distribution network covers major markets across North America, Europe, Asia-Pacific, the Middle East, Africa, and Latin America. We offer fast and reliable delivery to major ports and industrial centers worldwide, including Rotterdam, Los Angeles, Dubai, Singapore, and Shanghai.

With extensive export experience and full compliance with international trade regulations, we ensure smooth customs clearance and timely delivery for bulk orders. Our logistics team coordinates air freight, sea freight, and express courier services to match your project timelines and budget requirements.

Quality Assurance

This product is manufactured in ISO-compliant facilities located in Guangdong, China, with strict adherence to international quality standards. Each rocker arm assembly undergoes a machinery test report and video outgoing inspection to verify dimensional accuracy, material integrity, and functional performance before packaging.

We back this part with a 6-month warranty and a 6-month defects liability period, providing you with confidence in your purchase. Our quality control team monitors every production batch to ensure consistent reliability and longevity in demanding operating conditions.

FAQ

Q1: How can I confirm this rocker arm assembly fits my specific Hino J08E engine?
A: We recommend verifying your existing part number against our OEM reference 13800-E0040. If your current part matches this number or you are certain your engine is a Hino J08E, this assembly will fit. For non-standard variants, please share your engine serial number or a photo of your current part with our technical support team for confirmation.

Q2: What is the recommended installation procedure for this rocker arm assembly?
A: Installation should be performed by a qualified diesel mechanic following the Hino J08E service manual. Key steps include cleaning the mounting surface, checking valve clearance specifications, torquing bolts to manufacturer specifications, and performing a valve lash adjustment after installation. Always replace gaskets and seals as required.

Q3: What maintenance is required for the rocker arm assembly after installation?
A: Regular maintenance includes periodic inspection of valve clearance (every 500-1000 operating hours depending on application), checking for abnormal wear patterns, and ensuring proper lubrication. Listen for unusual clicking or tapping noises which may indicate improper adjustment or wear. The assembly itself requires no lubrication beyond the engine’s normal oil system, but clean oil and filter changes are essential for longevity.

WhatsApp